Expansion of Water Treatment Facilities, Phase II
Expansion of Water Treatment Facilities, Phase II
Location:
Al-Khafji
Capacity:
21,800m3/day
Technology:
Conventional
Scope of Work:
Engineering, procurement and construction of facilities required to treat 4,000GPM of industrial wastewater and ancillary oil recovery facilities. Reclaimer pit and related equipment including: 10 transfer pumps (capacity varies between 500-1,000GPM each); Corrugated Plate Interceptor (CPI) basins; sludge removal consisting of 16 cells (250GPM per cell); five CPI effluent pumps (1,000GPM capacity each); installation of eight hydrocyclones (500GPM each); two effluent water storage tanks (5,410m3 storage each); two multistage injection pumps (1,000GPM each, 1,000psi)
SETE’s Role:
Engineering, procurement, construction and project management