VVIP Palace’s Marina
VVIP Palace’s Marina
Construction of the main marina consisting of 3 berths
Coast guard berth
Jetty berth
Construction and installation of the navigation buoys, aids, anchoring blocks and lighting.
Construction of two navigation towers at the entrance of the marina
Floating docks including jet ski floaters
Excavation of 6 lagoons at 2.5m depth
Rock slope protection
Dredging works for the main marina basin at 8 meters depth.




Works